Day, date :
Kamis, 30 Januari 2014
Time
: 14.25-17.00 WIB
Place
: Gd. Kresna
Agenda
:
- Reviewing works of PIC from previous meeting.
- Evaluating the plan of sponsorship package along
with Marketing Division.
- Planning sponsorship's alternative option.
- Deciding PIC for each new tasks.
Attendances
:
SPONSOR AFFAIRS
- Aisyah Rahmayanti (19713042)
- Aliyyah Sarastita Rusdinar
(19713064)
- Amertya Ardya Oktoriano P. (19713009)
- Arannisa Hanifauzia Sa'ad (19713114)
- Desi Ratna Arimurti (19713172)
- Hubertus Nugroho Addo W. (19713088)
- Triana Apita Nugrahaeni (19713136)
MARKETING
- Agus Santoso (19713062)
- Dimas Ammar Azhari (19713100)
- Febrian Ulfa Ayu Romadhani (19713073)
- Fernanda Pandu Saputra (19713219)
- Fiqi Fatmawati (19713046)
- Monica Widjaja (19713147)
- Nabila Emira (19713143)
- Vika Anggraeni (19713005)
Meeting results
:
- List of PIC from previous meeting, along with its
realization (attached in this note).
- Sponsor package plan was reformed with Marketing
Division, seen from the aspect of feasibility (attached in this note).
- Sponsorship's alternative option was planned (attached
in this note).
- PIC for each new tasks are appointed (attached in this
note).
ATTACHMENT
PREVIOUS
MEETING'S PIC WITH ITS REALIZATION
Tasks
|
PIC
|
Realization
|
Confirming
the idea to use Ad-com for advertising Sponsor with Mr. Benny Yohanes.
|
Brian Charvia
|
Contacted,
waiting for reply.
|
Creating
and designing new blog of Sponsor Affairs Division.
|
Amertya Ardya O.P
|
Done and still being continued.
|
Coordinating
with Treasurer and ensuring that the financial report is finished on time.
|
Aisyah Rahmayanti
Aliyyah Sarastita
|
Treasurer hasn't finished their
audit.
|
Asking
for additional database of sponsor links to Evelyn Melindra (Tutorial 1D).
|
Ariesto Wijaya
|
Database of sponsor links has been
acquired.
|
Completing
the database of sponsor links from SBM2016 students Tutorial A, B, and C.
|
Arannisa Hanifauzia
|
Database of sponsor links has been
completed.
|
Completing
the database of sponsor links from SBM2016 students Tutorial D, E, dan
F.
Collecting
information about printing techniques from sponsor benefits from previously
existed proposals.
|
Hubertus Nugroho A. W.
|
Database of sponsor links has been
completed.
Information about printing techniques
has been collected, and was discussed in today's meeting.
|
Asking
for videos of Oddisey 2013 to its show organizers, for the interest of future
presentation.
|
Desi Ratna Arimurti
|
Some
has been acquired.
|
3rd
PLAN OF SPONSORSHIP PACKAGE
PS:
- There are some changes to the package name to name of
God and Goddess from Greeks mitology. The order based on lineage.
- Booth is eliminated because it is not effective.
- Website will not be created by Marketing division.
- The sponsor logo in magazine still need confirmation
from the editor of the magazine
SPONSORSHIP ALTERNATIVE
OPTION
1.
Advertisement in the booklet
An
offer to company or institution or personal who interested to have their
advertisement in the booklet of Oddisey 2014. There are 4 (four) type of
advertisement which can be attached in the booklet. The details as follows:
TYPE
|
PRICE
|
Full Color
|
|
One page
|
Rp2.500.000,00
|
Half page
|
Rp1.500.000,00
|
Black and white
|
|
One page
|
Rp1.000.000,00
|
Half page
|
Rp750.000,00
|
2.
Company's jingle
An
offer to company or institution to airing their company's jingle. The company's
jingle will be aired twice in one day show in the beginning and the end of the
show. The details as follows:
TYPE
|
PRICE/4days
|
Airing
twice/day
|
Rp5.000.000,00
|
Airing
4(four) time/day
|
Rp9.000.000,00
|
3.
The appearance of logo on the video opening ceremony of Oddisey 2014.
An
offer for company or institution who interested to present their logo in the
opening video ceremony of Oddisey 2014. The details as follows:
TYPE
|
PRICE
|
2
(two) days show
|
Rp4.000.000,00
|
4
(four) days show
|
Rp7.000.000,00
|
4.
Booth
An
offer to company or institution or personal who interested to have their own
booth or stand in the location of Oddisey 2014. The size of booth which will be
provided by the show organizer is 3x2 meter. Electricity, tables, and
chairs will be provided by us. Additional attribute is the responsibility of
the company or institute. This alternative option of sponsorship will be charge
Rp12.000.000,00.
CURRENT
PIC
TASK
|
PIC NAME
|
Surveying the
location of TBJ to assure the possibility of installing flag banner in a
large number.
|
Arannisa Hanifauzia
Sa'ad
Amertya Ardya
Oktoriano P.
|
Confirming the idea
to use Ad-com for advertising Sponsor with Mr. Benny Yohanes.
|
Brian Charvia
|
Confirming the
proposal design and the printing techniques to Afwan.
|
Aisyah Rahmayanti
|
Coordinating with
Treasurer and ensuring that the financial report is finished on time.
|
Ariesto Wijaya
|
Compiling
sponsorship packages with their benefits, for the need of proposal making.
|
Amertya Ardya
Oktoriano P.
Aliyyah Sarastita
Rusdinar
|
Making meeting
notes, and posting it in Sponsor Affairs Oddisey 2014 blog.
|
Hubertus Nugroho A.
W.
|
Asking for videos
of Oddisey 2013 to its show organizers, for the interest of future
presentation.
|
Desi Ratna Arimurti
|
by Hubertus Nugroho Addo Wibowo
19713088/1E
No comments:
Post a Comment